Professional Road & Fill Material Estimation with Correct Compaction Logic
Road/Pavement: You specify COMPACTED thickness. We calculate loose volume needed to achieve that compaction.
Road sub-base: 100–200mm | Base: 75–150mm | Wearing: 40–50mm
Road: 2–5% | Filling: 5–10% | High waste areas: 10–15%
Enter project parameters and click "Calculate Materials" to see results.
Length × Breadth × Thickness → Volume → Weight